सूर्य डैम जल विद्युत परियोजना सेवाएँ

हम डिजाइन, इंजीनियरिंग और निर्माण सेवाएँ प्रदान करते हैं। संपर्क करें!

उत्कृष्ट सेवाएँ और गुणवत्ता

★★★★★

हमारे बारे में

एसजेवीएन लिमिटेड, हिमाचल प्रदेश में सौर और जल विद्युत परियोजनाओं में विशेषज्ञता रखता है।

A large hydroelectric power station is constructed amidst rocky cliffs with a river flowing beside it. The station features multiple generators and complex electrical infrastructure on the roof. The building is integrated into the steep natural terrain, and the water appears to be a deep blue-green color.
A large hydroelectric power station is constructed amidst rocky cliffs with a river flowing beside it. The station features multiple generators and complex electrical infrastructure on the roof. The building is integrated into the steep natural terrain, and the water appears to be a deep blue-green color.
A large hydroelectric power plant located in a hilly landscape, featuring multiple penstocks leading into a powerhouse. The structure spans a river with visible power lines and surrounding greenery.
A large hydroelectric power plant located in a hilly landscape, featuring multiple penstocks leading into a powerhouse. The structure spans a river with visible power lines and surrounding greenery.

हाइड्रोइलेक्ट्रिक सेवाएँ

हम सिविल और हाइड्रो-मैकेनिकल कार्यों में विशेषज्ञता रखते हैं।

A large concrete hydroelectric power station structure is reflected in a calm body of water. The building features multiple large, square openings and is surrounded by electrical infrastructure, including visible power lines and towers. The sky is clear with a bright blue tone, suggesting a sunny day. Hills and greenery are visible in the background.
A large concrete hydroelectric power station structure is reflected in a calm body of water. The building features multiple large, square openings and is surrounded by electrical infrastructure, including visible power lines and towers. The sky is clear with a bright blue tone, suggesting a sunny day. Hills and greenery are visible in the background.
डिजाइन और इंजीनियरिंग

सुननी डैम परियोजना के लिए डिजाइन और इंजीनियरिंग सेवाएँ उपलब्ध हैं।

सिविल कार्य

हम सिविल कार्यों में उच्च गुणवत्ता और दक्षता प्रदान करते हैं।

हाइड्रो-मैकेनिकल कार्य

हाइड्रो-मैकेनिकल कार्यों में हमारी विशेषज्ञता परियोजना की सफलता सुनिश्चित करती है।

सौर ऊर्जा

सूर्य डेम जल विद्युत परियोजना का विवरण यहाँ है।

A large hydroelectric dam spans across a wide river, with utility poles and electrical infrastructure in the foreground. The surrounding area features sparse vegetation and paved roads. In the distance, there are buildings indicating an urban setting.
A large hydroelectric dam spans across a wide river, with utility poles and electrical infrastructure in the foreground. The surrounding area features sparse vegetation and paved roads. In the distance, there are buildings indicating an urban setting.
जल विद्युत

सूर्य डेम परियोजना की जानकारी उपलब्ध है।

A hydroelectric dam sits against the backdrop of a densely forested mountain. The structure is built across a river with visible turbines. The surrounding area includes rocky and dry terrain, while the sky is clear.
A hydroelectric dam sits against the backdrop of a densely forested mountain. The structure is built across a river with visible turbines. The surrounding area includes rocky and dry terrain, while the sky is clear.
परियोजना विवरण

एसजेवीएन लिमिटेड की परियोजनाएँ और सेवाएँ।

A hydroelectric dam channels water through a steep concrete structure with teal handrails. The river below is surrounded by rocky terrain and dense trees. The forceful flow of water creates foamy rapids as it descends. In the background, a bridge crosses the river amidst the rugged landscape.
A hydroelectric dam channels water through a steep concrete structure with teal handrails. The river below is surrounded by rocky terrain and dense trees. The forceful flow of water creates foamy rapids as it descends. In the background, a bridge crosses the river amidst the rugged landscape.
A large hydroelectric dam stands in the background with water flowing into a reservoir. The scene is viewed from a covered observation area with steps and railings leading down to a walkway. There are plants in pots and informational signs present.
A large hydroelectric dam stands in the background with water flowing into a reservoir. The scene is viewed from a covered observation area with steps and railings leading down to a walkway. There are plants in pots and informational signs present.
संविदा विवरण

ईपीसी अनुबंध पैकेज और सेवाएँ शामिल हैं।

निविदा संख्या

निविदा संख्या: dcb-ccd-sdhep-430-01।

स्थान विवरण

एसजेवीएन लिमिटेड द्वारा सुन्नी डेम जलविद्युत परियोजना का निर्माण, शिमला और मंडी में स्थित है।

स्थान

शिमला, हिमाचल प्रदेश

कार्यकाल

सोमवार से शुक्रवार